|
 |
|
Gold Refining
All material is chemically refined and processed.
|
|
 |
|
Albar's Junior
Albar calls this 28KW induction furnace Junior and is used
for all Gold and Platinum lots. With it's processing
power, it can handle all our Karat gold,
dental gold and other gold scrap
|
|
 |
|
In-house Waste Water
Treatment Facility
Large water tanks for treatment of all waste water.
|
|
 |
|
Silver Refining Facility
Albar's new state of the art chemical refining tanks.
Albar is now capable of chemically refining
40,000 oz. of fine silver a day.
This is the final step in the refining procedure.
|
|
 |
|
Two Of Albar's
Furnaces
Two furnaces, one processing 1200 lbs of silver
an hour, the other capable of pouring 3000 ounces
of shot every 15 minutes. |
|
 |
|
Albar's Bag House
28,000 CFM Bag House
This insures Albar meets and exceeds all
local and federal emission regulations.
|
|
 |
|
THE CAGE
Albar's secure storage area for all
Gold, Silver and Platinum bearing material.
|
|
 |
|
Albar's Staging Area
All material is categorized and placed
in this staging area before being processed.
|
|
 |
|
One Ton - Ball Mill
This Ball Mill is capable of size reducing 2000 lbs
of oversize media every 4 hours
|
|
 |
|
Large Scale
Film Wash System
These large vessels can process 600,000 pounds of
material on a monthly basis
|
|
 |
|
Pyrolisis
Oven
Oven capable of handling 5,000 lbs of material every 8 hours
|
| |